Planning application - DIS/2025/0013

Back to search results
Back to search

Comments are now closed for this application.

DIS/2025/0013
Discharge of Conditions
Hornsea Project Three Wind Farm
Full re-discharge of Requirements 15 of Schedule 1, Part 3 (Requirements) of the Hornsea Three Offshore Wind Farm Order 2020 (the Order) in relation to the Onshore Converter Station (ONCS) Surface and Foul Water Drainage Plan.
Information Provided
Orsted Power (UK) Ltd
5 Howick Place Westminster London SW1P 1WG
Orsted Power (UK) Ltd
5 Howick Place Westminster London SW1P 1WG
01/04/2025
-
Conditions Discharged
04/07/2025
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the Document for the required row, and an Adobe Acrobat pdf document will open.

Document File type Size Created Date
Plans & Drawings
Supporting Reports & Documents
Planning Decision Documents

Constraints List

Description

Consultee List

Consultee name Date sent Consultation expiry date Date received
-
-
-
-
-
-
-
-