Planning application - 3/1999/0026

Back to search results
Back to search

Comments are now closed for this application.

3/1999/0026
Full
Guist Bridge, Bridge Road, Guist
Construction of a temporary bridge to carry pedestrian and bicycle traffic over the River Wensum whilst existing bridge is reconstructed. The temporary bridge shall be removed when reconstruction work is complete
Application Approved
-
-
-
-
20/10/1999
-
Permitted / Approved
28/01/2000
Breckland
-
-
Guist
-
-
-
-
Elmham and Mattishall
-
-
-
-
-
-

To download a selection of individual documents place a tick alongside each of the relevant rows and then click on Download selected files. To download all of the documents place a tick in the box alongside the header row and all of the files will be selected, then click on Download selected files. To view individual documents click on the Document for the required row, and an Adobe Acrobat pdf document will open.

Constraints List

Description

Consultee List

Consultee name Date sent Consultation expiry date Date received
-
-
-
-
-
-
-
-